Environmental permitting for data center power

The permit decides whether you build, and how fast.

GigaPermit™ runs environmental permitting for behind-the-meter generation serving hyperscale data centers. Gas turbine and reciprocating engine facilities, from the first site screen to construction start, at development speed.

One team for every permit between site control and first fire.

Air, water, land, natural resources, and local approvals, scoped together so one track never surprises another.

Air

Air permitting strategy for combustion generation

Applicability determinations, emission limits, and control technology decisions that shape equipment selection and site design.

PSD and NSR, Title V, minor source and standard permits, BACT and LAER, dispersion modeling, GHG applicability, NSPS and NESHAP, Acid Rain and Part 75.

Water and natural resources

Water, species, and cultural resource permits

Supply and discharge secured early, and federal triggers identified before they land on the critical path.

Clean Water Act Sections 404 and 401, NPDES and state discharge, stormwater, water rights and supply, ESA consultation, NHPA Section 106, NEPA where a federal nexus exists.

Sequencing

Construction-start strategy

Permit sequencing built around your critical path, including early or at-risk construction provisions where state rules allow.

Agencies

Agency engagement and negotiation

Pre-application meetings, application responses, and negotiated permit terms with EPA regional offices, TCEQ, LDEQ, and other state and federal agencies.

Public process

Public comment and contested case support

Comment-period planning and hearing preparation alongside your community affairs team and counsel.

Handoff

Compliance handoff and regulatory watch

Permit conditions translated into clear obligations for engineering, EPC, and operations, plus tracking of federal and state rule changes that touch your portfolio.

A living permitting matrix your whole team can read.

Every project gets one matrix tied to its development schedule, milestones, and budget. Non-specialists use it to make go/no-go and capital allocation calls.

Illustrative sample
Track Site screen Scope Application Agency review Construction start Handoff
Air Attainment status and nearby Class I areas Major vs. minor source; BACT or LAER; GHG applicability Emission calculations, dispersion modeling, permit application Pre-application meeting, draft permit terms, public notice Permit issued, or early construction where the state allows Emission limits, Part 75 monitoring, Title V timeline
Water Supply availability and receiving waters Water rights, discharge, and stormwater needs NPDES or state discharge permit; 404 and 401 where triggered Agency questions and permit terms Construction stormwater coverage in place Discharge limits, sampling, reporting
Natural and cultural resources Wetlands, protected species, cultural resources desktop review Field surveys; federal nexus check ESA consultation, Section 106, NEPA where a nexus exists Agency coordination and concurrence Clearing windows and avoidance measures set Mitigation commitments
Land and local Zoning and land-use screen List of local approvals and decision bodies Site plan, special use, and building submittals Hearings and community meetings Local permits in hand Conditions of approval

Rows and requirements vary by state, site, and equipment. Each cell in a live matrix carries an owner, a date, a budget line, and a risk flag.

From site screen to construction start.

  1. Step 1

    Screen

    Check prospective sites for permitting fatal flaws before you commit capital.

  2. Step 2

    Scope

    Define every permit the project needs and build the matrix, schedule inputs, and budget.

  3. Step 3

    File

    Run studies, modeling, and applications, directing specialist consultants and counsel on scope, cost, and quality.

  4. Step 4

    Negotiate

    Lead agency meetings, answer comments, and settle permit terms you can build and operate under.

  5. Step 5

    Hand off

    Pass permit conditions to engineering, EPC, and operations as clear construction and commissioning obligations.

Why AquaNRG

AquaNRG is a Houston environmental and energy technology company that builds diagnostic models, data analytics, and digital screening tools. GigaPermit puts that screening discipline to work on the permits that gate data center power.

  • Built for behind-the-meter and co-located powerFirst-of-a-kind configurations get an applicability analysis, not a template.
  • Multi-state by designOne method across state permitting authorities, for portfolios in ERCOT, PJM, SPP, MISO, TVA, SERC, and WECC territory.
  • Risks flagged early, with optionsEach flag arrives with the paths around it and what each one costs in time and money.
  • Executive advice, hands-on deliveryThe person briefing your investment committee also reviews the application.

Send us a site. Get a permitting read before you commit.

Tell us where, how many megawatts, and what equipment. We reply with what a fatal-flaw screen would cover and when you would have it.